Annual Operations Plans

This page is the site of occasional postings related to the Annual Operations Plans (AOP) for the Forest Grove and Tillamook Districts of the Tillamook State Forest.

Annual Operations Plans match up to the Oregon Department of Forestry Fiscal Year which runs July 1 - June 30.


FY'20 AOP (July 1, 2019 - June 30, 2020)


Forest Grove District Proposed Gate Location Maps

The Forest Grove District FY'20 AOP includes the proposed installation of gates at several locations.  This is being proposed as a fire prevention effort.  The proposed gate installation locations are marked in red on the maps below.

Larch Mountain Basin


Lousignont Road Area in the Wheeler Basin


McGregor Basin - Music Road Area